Client: Shell
Contract sum: € 16.600.000,-
Schedule: 2016 - 2017

Civil works for the new SDA plant :

  •          Piling (700 Vibro piles)
  •          Piling (285 Fundex piles)
  •          Concrete slabs and foundations (in situ)
  •          Concrete columns and beams (in situ)
  •          Concrete columns and beams (precast)
  •          Concrete pits  and sumps
  •          Concrete paving
  •          Installation of underground cables (cable pulling)
  •          Sewer works (HDPE and carbon steel) 
  •          Site finishing
  •          Design and construct of Auxiliary Room (FAR building)
  •          Architectural work
  •          Construction of a RoRo berth.

Remarks :            Contractor = Fluor / Jacobs