New Deltagoot Project

Client Deltares Vastgoed & Bouwzaken   
Contract sum € 19.000.000  
Building time September 2012 – November 2014      

Engineering and construct of new research facility.
- 60.000m3 earthworks (combination of wet and dry)
- Dewatering (deepwell & return drainage)
- 77 “Vibro” piles Ø  406/450 mm lenght 22m
- 812 “Vibrocombinaton” piles Ø  508/610 mm lenght 31m
- 14.000m2 sheet piling
- 6.500m3 of concrete foundations and floors
- 7.500m3 of concrete walls
- 1.000 tons rebar
- 750m1 of joints (watertight)
- Workshop 48x29x12m
- Operating Building 40x9x6m
- Coordination of third parties

 

Location

Delft

Project Information

Project Owner: Deltares Vastgoed & Bouwzaken

Project Phase: Opgeleverd

Construction Time: 2012 - 0001

Function category: Infra droog – besloten terrein,Infra droog