In Plant Houses

Client: Esso Nederland B.V.
Contract sum: € 1,950,000.00
Schedule: 2012


Scope of which generally consist of:
- Removing the existing site finishing, building site preparation;
- Removing emergency stairs including Foundation of existing FCC building;
- Excavating;
- Performing on site soil remediation BE (95m3);
- Putting 22 + 37 drilling pipes;
- Walls, columns and roofs are deposited in the work;
- Supplying and installation of steel siding;
- Supplying and installation of blast proof frames, Windows and doors;
- Supplying and installation of floor and wall tiles;
- Supplying and installation of siling system;
- Supplying and installation of metal –stud walls;
- Laying of rubber flooring and apply vinyl wallpaper;
- Painting work;
- Interior fittings;
- E&I and HVAC installations;
- Ground finish.

Location

Rotterdam

Tags
  • Oil & Gas